FGT’s South Florida Project includes the construction of approximately 38 miles of lateral pipeline with a capacity of roughly 230 million cubic feet per day to serve the South Florida region, as well as a new compression station and a new delivery point.

By increasing FGT’s natural gas deliveries to the South Florida area, this project will enhance the ability for the region to continue to count on a dependable natural gas energy supply to support its growing population and economic needs, including electric generation.

About The Project

  • Overview

    The South Florida Project lateral will originate at a tie-in with FGT’s existing 30-inch pipeline with a new delivery point in Martin County and extend south approximately 38 miles to a customer-owned delivery point in Palm Beach County. The 24-inch underground pipeline will be supported by one compressor station located in Palm Beach County.

  • Survey & Construction

    The South Florida Project teams have begun surveying areas to identify the safest and most environmentally responsible route. To accomplish this, the project teams are performing civil, environmental, and endangered species surveys as part of the pipeline route study.

    Dependent on final approvals, the majority of construction is expected to take place from Q4 2028 through Q4 2029. Construction will be managed by FGT.

About The Project

Pipeline Safety



Reliability

FGT’s top priority is to provide safe and reliable transportation of natural gas on its system. Construction of the South Florida Project will include visual and Non-Destructive Examination (NDE) of every weld that joins sections of pipe together.


Quality Assurance

The new pipeline loops will be tested with water at 1-1.5 times normal pressure, and regulation devices will be installed to help prevent pressure from exceeding safe limits.


Monitoring

All safety valves for the mainline loops will be remotely controlled and monitored for pressure at all times, 24 hours a day – 7 days a week. PHMSA currently requires that interstate pipeline system ROWs be routinely patrolled for any potential hazards. FGT utilizes a fleet of aircraft to conduct aerial surveys of its pipeline ROWs on a weekly basis.

Regulatory

FGT is an interstate natural gas pipeline regulated by the Federal Energy Regulatory Commission (FERC). FGT will file an application for a “Certificate of Public Convenience and Necessity” with FERC under the Natural Gas Act. FERC will serve as the lead Federal agency responsible for ensuring compliance with pipeline regulation and the National Environmental Policy Act (NEPA)

Additionally, FGT will file permits with, provide information to, and engage in required consultations with:

  • U.S. Army Corps of Engineers (USACE)
  • U.S. Fish and Wildlife Service (USFWS)
  • U.S. Department of Energy (DOE)
  • U.S. Department of Transportation (USDOT)
  • Florida Fish and Wildlife Conservation Commission (FWC)
  • Florida Historical Commission (FHC/SHPO)
  • numerous state entities

FGT’s pipeline system is governed by federal environmental laws including, but not limited to:

  • Clean Water Act
  • Clean Air Act
  • Rivers and Harbor Act
  • Endangered Species Act
  • Historic Preservation Act
  • FGT’s pipeline system is governed by the U.S. Pipeline and Hazardous Materials Safety Administration (PHMSA), ensuring compliance with federal safety regulations.

FGT’s right-of-way personnel are making direct contact with affected and abutting Landowners close to the South Florida Project areas, and FGT will remain available to all Landowners throughout the South Florida Project construction process to address any questions or resolve concerns, and FGT will notify affected Landowners prior to the commencement of Project related construction activities.